PEG Substructure for Photovoltaik Power Plants

The most efficient and innovative PV substructure on the market sets standards in terms of material consumption, time savings and low machine utilization. The PEG system is amazingly simple and keeps construction costs low.

What increases the construction costs for a photovoltaic power plant? In short, it's the construction time, the material costs and the required machine usage. In developing the PEG substructure, we have optimized exactly these three factors. The result is a simple and unique solution. The PEG substructure has a low overall height and rests on slim steel bars, instead of on high and solid steel girders. Due to the lightweight construction no foundations are needed. In this way, the use of materials is reduced to less than 50 percent compared to conventional solutions. Less material and a simple design lead to reduced labor costs and the phase between planning and commissioning is reduced significantly.

PEG Advantages at a glance

  • Lightweight design saves up to 65% on material and logistics costs (fewer containers for shipping)
  • Simplified and fast installation reduces labor and machinery costs by more than 50%
  • Very high utilization rate of 1.4 MWp per hectare due to patented system design adapted to the terrain
  • Flat module angles avoid shading effects and allow maximum space efficiency
  • Comparatively constant energy production throughout the day due to low angular alignment
  • Environmentally friendly: More than 50% less use of materials (steel, power cables), resulting in a better CO2 balance
  • Increased occupational safety and ergonomics due to simplified installation process at a height of 0.8 meters without overhead work
  • Also well suited for areas with size limitation, narrow extension or extremely poor accessibility
  • Within the PEG construction no foundations are needed
  • There are no heavy construction equipment used
  • Line-by-line installation with PEG installation system achieves a record-breaking installation time of less than 1000 man-hours per MWp
  • Specialized aerodynamic proofed design
  • Residue-free dismantling after runtime possible

Contact & Information

Do you need further information about the PEG system? Do you have questions regarding a concrete project?

Please do not hesitate to contact us. We will be pleased to help you.

Herbert Heidel 
Sales Manager

Telefon: +49 (0) 170 / 789 33 57
E-Mail: herbert.heidel@jurchen-technology.com

 

 

Andrea Vidoni
Account Manager

Telefon: +49 (0) 9321 2680 295
E-Mail: andrea.vidoni@jurchen-technology.com