Trapeze bridge

With our trapeze bridge, you can save an expensive rail system.  

  • Individually adjustable for all framed modules
  • Cost-effective solution
  • Faster installation on site
  • A Rail system is not needed
  • Application of highest-quality materials for a long product life cycle
  • Proven product design through intensive development and test phases with our belgian partner Joriside
  • High and reliable delivery capacity
  • Adjustable for every ledge spacing

Trapeze bridge vertical

  • Individually adjustable for all framed modules
  • Very flexible
  • Cost-effective solution
  • Faster installation on site
  • A Rail system is not needed

Informationen & Sales

Do you need further information? Do you have questions regarding a concrete project?

Please do not hesitate to contact us. We will be pleased to help you.

Herbert Heidel
Consulting and sales
Mobil: +49 (0) 170 / 789 33 57
E-Mail: herbert.heidel@jurchen-technology.com

Andrea Vidoni
Account Manager
Phone: +49 (0) 9321 2680 295
E-Mail: andrea.vidoni@jurchen-technology.com