PEG® SD substructure for PV power plants

While standard PEG system is an east-west oriented system, the modules in the PEG SD version are aligned conventionally.

The revolution

The PEG System is a revolution in the field of substructures for solar power plants with framed modules. The PEG substructure is a light and efficient system. Substructures of our competitors are heavier and more expensive. Most of them need concrete foundations and heavy machines. The PEG system delivers low levelised cost of electricity (LCOE) with a high efficiency of space and a large volume scalability.

The PEG system significantly reduces both substructure supply and delivery as well as installation costs. Due to the lightweight construction no conventional foundation is needed. Less material and a simple design lead to reduced labor costs and the phase between planning and commissioning is reduced significantly.

PEG® SD Advantages at a glance

  • Up to 16 degrees slope inclination
  • Perfect for steep slope, if no heavy equipment is allowed
  • Light components are easy to transport on off-road terrain at the hill
  • Simple and fast installation reduces labor and machinery costs by more than 50%
  • Highly efficient area utilization of 1.2 MWp per hectare due to patented ground-guided power plant system
  • Lightweight design saves material and logistics costs (less containers to be shipped)
  • Flat module angles avoid shading effects and allow maximum space efficiency
  • Comparatively constant energy production throughout the day due to flat 8° east-west orientation
  • Preserving resources: up to 50% lower raw material usage (steel, power cables), resulting in a better CO2 balance
  • Higher installation safety through much simpler assembly, e.g. no working-on-heights; ergonomic working mostly in the range of 0.8 m
  • Adaptable to limited site dimensions, insufficient space and narrow available land or extremely poor accessibility
  • No foundations required for PEG construction itself
  • No heavy machines required
  • Residue-free dismantling after project life

Cost reduction

PEG® SD - the PEG version with conventional module alignment

Informationen & Sales

Do you need further information? Do you have questions regarding a concrete project?

Please do not hesitate to contact us. We will be pleased to help you.

Herbert Heidel
Consulting and sales
Mobil:
+49 170 7893357
E-Mail: herbert.heidel@jurchen-technology.com

Carolin Kaestner
Inquiries & Offers
Phone:
+49 9369 98229-6605
E-Mail: carolin.kaestner@jurchen-technology.com

Andrea Vidoni
Project Manager
Phone:
+49 9369 98229-6604
E-Mail: andrea.vidoni@jurchen-technology.com