PEG®

Patented Mounting System for Solar Power Plants

 

Increase Your Land Yield by 225%

PEG- Patented Mounting System for Solar Power Plants

The PEG® provides a unique simplified high-density ground mount solution that produces 225% more land yield versus trackers and fixed tilt systems. The low profile 8-degree tilt design requires minimal spacing between modules creating an ocean of solar panels.

The PEG® is very mobile, light weight, simple to install with only hand tools, no DC trenching, no foundations, no concrete and requires minimal land giving you flexibility of choosing where to install. The PEG® provides a more sustainable solution for solar at a significantly reduced CAPEX.

PEG - Patented solar mounting system

Simplified Design

PEG Solar Mounting - Design
1) Subject to the site conditions and system design
2) For exceptional permafrost conditions, the ramming depth could be up to 2m, done by the use of two rods crimped together onsite through a sleeve, subject to project-specific approval.

Efficiency Improvement

Yield of PEG Solar Power Plant
Working Hours PEG Solar Power Plant
PEG Solar Logistic

Cost Reduction

Reduced machine costs for solar power plants
less machine costs
Reduced logistic costs for solar power plants
less logistic costs

177 Plants

463 MWp

34 Countries

PEG® Advantages at a Glance

  • 225% improved land yield versus leading trackers and fixed tilt
  • Low profile avoids shading and maximizes land utilization
  • Designed in Germany to be simple and minimize CAPEX
  • Aerodynamic proofed design up to 298+ km/h (185+ mph) winds
  • Hand tools only (no heavy machinery required)
  • Fast and easy mobilization
  • No foundations
  • No DC trenching
  • Integrated wire management
  • Reduced install times (50% versus trackers)
  • Preserving resources: up to 50% lower raw material usage (steel, power cables), resulting in a better CO2 balance
  • Highest point is 1 meter (3.3 feet) leading to improved H&S
  • Low profile means less pushback from neighbors for permitting
  • Simplified dismantling after project life

Webinar: High-Density Ground Mount Racking Solution with Significant CAPEX savings

Webinar: A cost competitive innovation for the Middle East

PEG documents available upon request

Case Studies, Bankability Report and Carbon Footprint report

PEG solar O&M

Solar Cleaning Solutions

Solar mowing

Vegetation Management

inspection solar power plant

Solar Module Replacement

Downloads

Brochure PEG Racking system

Brochure
PEG Substructure

Overview PEG Racking system

Overview
PEG Substructure

Reference list PEG racking system

Reference List
PEG Substructure

Overview PEG SD

Overview
PEG SD

Gal-In PEG
Module Cleaning

Mowing Solution RAYMO

PEG Mowing Solution
RAYMO

Solar Racking System Request

Form for statics
PV Substructure

Overview
PEG Substructure

PEG
Data Sheet

PEG High Load

PEG HL
Data Sheet

PEG Ballast Design
Data Sheet

Info for Project Developers

Approved Modules

PEG Design

PEG Installation

Image Gallery

solar power plant barcaldine Barcaldine, Australia Solar plant Suhlendorf Suhlendorf, Germany Solar plant Dareton Dareton, Australia Solar power plant Lembruch Lembruch, Germany Solar power lant Mesilot Mesilot, Israel Solar plant Belvedere Maastricht, Netherlands PV Module Mounting Module Mounting Solar plant Huanguelen Huanguelen, Argentina Rod Ramming Rod Ramming Australia Australia Solar plant Dareton Dareton, Australia Installation of PV Modules Installation, Australia Baroota, Australia Hessenport, Netherlands PEG rods for Solar power plant PEG Rods Solar plant in Oman Adam, Oman Reinsdorf Solar power plant Reinsdorf, Germany

Sales

Henner_Jahnke

Henner Jahnke

Chief Sales Officer
+49 171 4100494
henner.jahnke@jurchen-technology.com
Herbert Heidel

Herbert Heidel

Europe, Africa
+49 170 7893357
herbert.heidel@jurchen-technology.com
Matthew Lusk

Matthew Lusk

North & South America, Caribbean
+1 209 2475658
matthew.lusk@jurchen-technology.com
Amit Chheda

Amit Chheda

Rooftop & cabling - Asia, India
+91 9167775740
sales@jurchen-technology.com
Yoni Ben Mazia

Yoni Ben Mazia

Israel, Australia
+972 54 7714967
info@jurchen-technology.com

Internal Sales Service & Project Management

Andrea Vidoni

Andrea Vidoni

Project Manager
Worldwide
+49 9369 98229-6604
andrea.vidoni@jurchen-technology.com
kontakt_sabrina-klippel_100x100

Sabrina Klippel

Project Manager
Worldwide
+49 9369 98229-6606
sabrina.klippel@jurchen-technology.com
* Explanation of key figures:
MWp/ha: Referring to the complete DC area, including the gaps between the DC blocks/tables
kWp/man-hour: Time for complete installation of a PEG solar power plant incl. inverter stations
MWp/container: Only the substructure
Machine costs: Referring to all machines for the installation of the DC system, compared to a conventional substructure
Labor costs: Labor for complete installation of the PEG solar power plant, incl. inverter stations, compared to a conventional substructure
Logistic costs: All, including machinery and labour, to the site and onsite, compared to a conventional substructure
All figures are indicative, may differ regionally and assuming the use of 380-400W modulesPictures:
Jurchen Technology GmbH, Meralli Projects PTY Ltd, Belectric GmbH, Volta Solar BVAll data may subject to alterations and errors.