Stunning facts and figures

From last weekly report:
  • 10,919 piles rammed
  • 82,470 modules installed
  • 22 MVPS installed
  • 22kV switch-room works ongoing
  • 14,816 metres of AC trenching complete
  • 5,595 metres of DC trenching complete