Category: General

Jurchen Technology delivers ArCon DC cabling for water reservoir Alonim in Israel

The water reservoir Alonim in Israel was realized in December with 4,000 of our waterproof ArCon cable harnesses. The floating substructure was supplied by Sungrow Floating. The ArCon cabling system provides a cost-efficient solution for DC Cabling on FPV, with 50% or less DC Cabling compared to other cabling solutions, while preserving high quality and [...]
Read More

12MWp PEG solar power plant on former landfill site Belvédère commissioned

On 7 October 2020, the PEG solar power plant Belvédère was officially commissioned. The plant is located on the former Belvédère landfill in Maastricht, Netherlands and has a flat plateau of approximately 10 hectares, which is suitable for the installation of a solar farm under strict conditions. The PEG substructure in combination with anchor rods [...]
Read More

Jurchen Technology supplies cable systems for solar projects in France

Helmstadt, Germany – At the start of the year, Jurchen Technology secured new contracts for producing and supplying cable systems. The cables will be used in French solar projects with a total capacity of around 28 MW in the Dordogne and Guadeloupe Départements. Jurchen Technology supplies ArCon series harness cables, which are particularly weather-resistant due [...]
Read More

PEG Bankability Report Available

The DNV GL bankability report for Jurchen Technology's PEG racking solution is now available! Highlighted in the report is the PEG’s land utilization is 225% higher land yield versus trackers and other fixed-tilt systems, making it a game-changer and ideal solution for land constrained sites. picture: An ocean of solar panels made possible with the [...]
Read More